Mine Decommissioning
Evaluating. Designing. Utilising.
Part of the decommissioning process of a mine is to consider the landscape design and usage after the extraction of a deposit. The design of the landscape must ensure long-term safety, a low maintenance and sustainable use after completion of the mining process. Planning must take geotechnical, hydrogeological and landscaping factors into consideration. Based on this we can develop a complex and unique redevelopment plan for you.
Tasks
- Planning the design of the post-mining landscape
- Ensuring long-term stability
- Calculation of groundwater resurgence and development of flooding concepts
- Pre-determining water quality during and after the completion of the flooding process in the mine cavities
Our Services
- Conducting stability tests
- Groundwater modelling to forecast groundwater resurgence and developing water quality
- Technical planning for the final design of the land used
- Accompanying licensing procedures (final business plans) and water law licensing procedures
- Infrastructure re-utilisation planning
- Analysis of the determination of mine damage for the assessment of risks in historical mining locations
- General monitoring
Your Benefits
- Expert assistance provision
- Planning safety and risk management
- Legal and cost security
- High quality and reliable planning bases
- Years of experience and local knowledge for the successful and sustainable design of the post-mining landscape
- Regional networking
- Interdisciplinary services from a one provider