Mine Decommissioning
Evaluating. Designing. Utilising.
Part of the decommissioning process of a mine is to consider the landscape design and usage after the extraction of a deposit. The design of the landscape must ensure long-term safety, a low maintenance and sustainable use after completion of the mining process. Planning must take geotechnical, hydrogeological and landscaping factors into consideration. Based on this we can develop a complex and unique redevelopment plan for you.
Tasks
- Planning the design of the post-mining landscape
- Ensuring long-term stability
- Calculation of groundwater resurgence and development of flooding concepts
- Pre-determining water quality during and after the completion of the flooding process in the mine cavities
Our Services
- Conducting stability tests
- Groundwater modelling to forecast groundwater resurgence and developing water quality
- Technical planning for the final design of the land used
- Accompanying licensing procedures (final business plans) and water law licensing procedures
- Infrastructure re-utilisation planning
- Analysis of the determination of mine damage for the assessment of risks in historical mining locations
- General monitoring
Your Benefits
- Expert assistance provision
- Planning safety and risk management
- Legal and cost security
- High quality and reliable planning bases
- Years of experience and local knowledge for the successful and sustainable design of the post-mining landscape
- Regional networking
- Interdisciplinary services from a one provider
Weitere Leistungen aus dem Bereich Land Recycling
Contaminated Building Substance Investigation
Contaminated Sites
Deposit Investigation
Investigation
Waste Declaration Investigations
Buildings
Waste Disposal and Recycling Management
Contaminated Building Substance Remediation
Deposit Evaluation
Waste Disposal Strategy
Demolition Planning
Extraction Planning
Remediation
Site Supervision
Landfill Technology
Site Management
Appraisement
Initial State Report